
Obtain a useful order of magnitude for an initial load assessment. The result must be confirmed according to the equipment, their startups and operating conditions.
The calculation converts your input using the selected network and chosen power factor. It does not replace a study of inrush currents or load simultaneity.
Inrush currents at startup, load simultaneity and operational changes can exceed the observed rated power. The reserve proposed here is a guideline, not a sizing validation.
For a generator selection, MANOMAT examines the equipment to be powered, the start-up regime, the reserve, standards and site constraints.